Oracle – Waterfront Development

EEA was proud to provide MEP design services for this new multi-building office campus complex in Austin, Texas for the Oracle Corporation. Phase 1 included a new two-wing office building totaling 560,000 GSF with parking on the ground floor, a stand-alone parking garage, and a central utility plant for heating and cooling utilities. Building spaces include enclosed offices, open work areas, conference rooms, a cafeteria/kitchen, fitness area, formal conferencing center, and other typical non-employee areas. Phase 2 adds a new 8-story, 420,000 GSF office facility and parking garage expansion, as well as separate kitchen/cafeteria spaces. The buildings are designed to achieve a 2-star rating through the Austin Energy Green Building Program and a Silver rating through the LEED for New Construction rating system. Phase 2 is currently under construction.