1. Home
  2. >
  3. Projects

Projects

EEA has completed projects worldwide, and is licensed in all 50 states and the District of Columbia. Learn more about some of our  past projects below. Use the “Services” and “Markets” pull down menus to filter your results.

  • 600 W. 5th
    EEA provided MEP Engineering Services for the new LEED Silver, sixteen-floor (8 parking, 8 office) high rise office tower. The building consisted of four hundred...
  • Cedar Park Public Library
    The new Cedar Park Public Library is a vibrant hub for knowledge, creativity, and community connection. Designed with state-of-the-art technology and sustainable architecture, the library...
  • Union on 24th
    EEA delivered comprehensive MEP services for a 30-story student housing tower near UT campus. The building features approximately 475 residential units, with a rooftop activity...
  • Easton Park - Skyline Park
    EEA provided MEP engineering services for the development of a 26-acre signature park Brookfield Residential in Austin, Texas. The park contains the following areas/features: Pavilion...
  • St. Edward's University Teresa Hall
    EEA's services included the targeted replacement of existing sanitary piping within 18 restrooms on the second floor of the residence hall, addressing multiple piping failures...
  • Bureau of Indian Affairs Sherman Indian High School
    EEA played a pivotal role in revitalizing the existing high school by providing the conceptual and schematic design for electrical and plumbing renovations under the...
  • Spectrum Office Building
    New, two-building office development. EEA provided MEP design of three stories shell building, including corridors, common restrooms on each floor, and main floor lobby area. 
  • Tower Life Building
    The Tower Life, historically known as the Smith-Young Tower was completed in 1928 as Mixed Use (office & retail). The scope of this thirty story...
  • University of Texas at Austin - Hogg Memorial Auditorium
    Built in 1933, Hogg Memorial Auditorium was the first theater on campus and was part of the "Union Group" buildings, financed almost entirely by student...
  • Westminster Senior Living Facility
    Senior Living Facility, Independent Living, Assisted Living and Memory care. 130,000 square feet, 5-story above grade, 3-story below grade parking garage. Includes common spaces (i.e....
  • Confidential Client - Data Center Cooling Equipment Expansion
    This data center is currently designed for 7 MW (1991 tons) of computers, using a nearby CUB (chillers) to provide cooling. Phase 1 of the...
  • Texas Mutual Insurance
    EEA performed LEED Enhanced commissioning and AEGB Additional commissioning services for a new approximately 260,000 square foot fully finished out commercial office space in Austin,...
  • Bouldin Creek Commons Commissioning
    EEA provided commissioning services for the new Bouldin Creek Commons. The building – a seven-story mixed-use development that supports 147,000 square feet of Class-A office...
  • University of Texas at Austin Perry-Castañeda Library Scholars Lab
    The Scholars Lab is a library-based campus-wide resource that provides researchers with infrastructure, UT Libraries subject librarian and domain-situated expertise, and opportunities for learning, consultation,...
  • Kissing Tree Golf Club
    The Kissing Tree Golf Course is the first new, semi-private 18-hole golf course to be built in Texas in the past five years. The course...
  • sweetgreen
    Over the last decade, sweetgreen has become a health food hotspot with various locations all across the U.S. In every storefront, their mission is to...
  • Huckabay Independent School District Animal Barn and Practice Facility​
    Huckabay Independent School District has a new 12,623 square-foot, Animal Barn and Practice Facility which will support the district’s agricultural education program. The facility includes...
  • Santa Fe High School Commons
    EEA provided MEP services for this multi-phase project to add 44,000 square feet to an existing high school facility. The first phase of the project...
  • Arroyo Del Oso Elementary School
    EEA provided MEP services for the new 80,000 SF two-story elementary school, designed to be LEED Certified. The school’s first floor contains an administration wing...
  • College and Career High School
    Central New Mexico Community College and Albuquerque Public Schools have joined forces to develop a dual-credit school located on CNM's main campus that allows students...
  • Shalom Austin - Dell Jewish Community Center
    EEA provided MEP services for the Dell Jewish Community Center. The project spanned multiple phases and included the renovation and expansion of multiple existing buildings,...
  • Austin Energy Headquarters
    The new corporate headquarters for Austin Energy is located in the Mueller development and consists of about 280,000 square feet of office space, including a...
  • The City of Albuquerque - Explora X-Studio
    This project for the City of Albuquerque involved the renovation of ~3,000 square feet and addition of ~8,000 square feet to the existing Explora Science...
  • Texas Woman's University Campus-Wide Arc Flash Analysis
    This multi-phase project consisted of the following studies for over 50 buildings on the Denton campus: short circuit current and equipment evaluation study, limited protective...
  • Natera
    Natera is a biotechnology company specializing in advanced genetic testing and diagnostics, particularly in reproductive health, oncology, and organ transplant. Known for its non-invasive prenatal...
  • Texas A&M University, Pandemic Influenza Facility and Live Virus Vaccine Facility
    The $103 million projects are part of the Texas A&M Center for Innovation in Advanced Development and Manufacturing (CIADM). The facilities were designed to enhance the...
  • Fierce Whiskers Distillery
    EEA provided MEP engineering on the design and construction of a new, 12,000 square-foot distillery in southeast Austin, Texas. The building included a 7,500 square-foot...
  • Central New Mexico Community College Ken Chappy Hall Art Building Renovation
    EEA provided MEP engineering services on Central New Mexico Community College’s Ken Chappy Hall renovation project, which converted campus offices into a new home for...
  • Texas State University Alkek Library Renovations
    This project involved the replacement and design of a 220,000 CFM built-up air handling unit located in the basement of Alkek Library, along with four...
  • TWU Science and Technology Learning Center Commissioning
    This new campus building will provide space for classrooms and research laboratories serving biochemistry, biology, chemistry, psychology, and nutrition departments. The building will also house...
  • The University of Texas at Austin - Doty Fine Arts Building Renovation
    EEA has completed multiple renovation and expansion projects in UT Austin’s Doty Fine Arts Building as part of an existing IDIQ contract. Much of this...
  • GSA JJ Pickle Federal Office Building
    This project involved major alterations to the 9 story above grade, 292,900 sq ft design build office and lab space renovation of the J.J Pickle...
  • Texas Facilities Commission North Austin Complex Phase I Commissioning
    This project is the Phase One of the new North Austin Complex development and includes a 406,000 gross square foot state office building, central plant,...
  • City of Austin District Cooling Plant #3
    https://www.youtube.com/watch?v=249xO8fDrI8 Rapid Population Growth Puts Added Pressure on Cooling Plants   The Austin metro area is experiencing tremendous growth. Neighboring Georgetown, Texas in Williamson County was ranked the...
  • Intelligentsia Coffee Shop
    The Austin, TX inspired coffee bar was designed as part of an existing shell, ground floor, of a multi-story office building. EEA performed MEP design services...
  • 701 Rio Grande
    701 Rio Grande project involved the construction of a new core and cold/dark shell five story office building with second through fifth floors being office...
  • Oskar Blues Brewery
    The new construction brewery project included manufacturing space, grain mill room, mechanical spaces, office spaces, a 6,000 sq. ft. cold room and a 5,000 sq....
  • City of Austin - Permitting and Development Center
    EEA performed Mechanical, Electrical, Plumbing, and Fire Protection (MEPF) scopes of work for the new City of Austin Permitting & Development office building and parking...
  • Oracle - Waterfront Development
    EEA was proud to provide MEP design services for this new multi-building office campus complex in Austin, Texas for the Oracle Corporation. Phase 1 included...
  • Austin Independent School District
    EEA completed MEP design and construction phase services for the renovation of the Southfield Building, which is becoming Austin Independent School District’s administrative offices.  This project...
  • ARRIVE Hotel
    The ARRIVE Hotel East Austin is a 77,000 sf complex comprising eighty-three rooms and a multi-use podium housing two restaurants, three bars, a coffee shop...
  • Auditorium Shores and Butler Park
    A Decade in the Making EEA worked with TBG Partners and the Austin Parks Department on a variety of projects around Auditorium Shores, including the MEP...
  • TurboCharger R&D Facility
    POWERFUL STUFF! EEA has decades of electronics clean manufacturing experience, but as Monty Python would say, “And now for something completely different”!  In 2000 EEA worked...
  • Chase Bank
    Long Term Partners EEA has helped Chase Bank renovate and build new branch offices since 2004. Our partnership began when we helped them design and build...
  • Gradalis
    Personalized Therapy In the global fight to cure cancer, an emerging trend has evolved around personalized therapies.  Beginning in 2006, EEA worked with Gradalis to finish-out...
  • Guadalupe Valley Electric Cooperative (GVEC) Commissioning
    Verifying the Design Works as Intended By providing Fundamental and Enhanced Commissioning services as part of the Leadership in Energy & Environmental Design (LEED) certification program,...
  • Sul Ross University Campus Operations
    Steam System Decentralization The steam heating system at Sul Ross University in Alpine, Texas was nearing the end of its useful life. The generating boiler and...
  • Our Lady Queen of Peace Chapel
    The Heart of St. Edward’s University Our Lady Queen of Peace Chapel sits at the heart of St. Edward’s University, overlooking downtown Austin. The chapel was...
  • University of Texas at Austin Tower Air Handler Replacement
    It’s About Time, it’s About Space! The Main Building Tower on the campus of The University of Texas at Austin is one of the most iconic...
  • Texas State University Campus Energy Audit
    Bringing in the Right Team With Texas State University’s commitment to Sustainable Stewardship came a recognition that the campus needed to take steps to reduce building...
  • UT Dallas Utility Infrastructure Improvements
    How Much, and Where? In the spring of 2009, with two new large buildings slated for construction and more on the way, The University of Texas...
  • Maruchan, Texas
    Billions of Noodles Maruchan is the largest ramen noodle manufacturer in the United States. Out of 3 ramen noodle packages sold in the US, 2 of...
  • Singapore Electronics Manufacturing Plant
    A Record Breaking Facility In 1999 EEA completed work on a new 3-story, 550,000 square foot electronic products manufacturing facility in Singapore.  The project team delivered...
  • Chemical Packaging Line Expansion
    Volatile Situation In 2013 a high-purity chemical supplier to the semiconductor industry wanted to expand their mixing and packaging area. Due to the flammability of the...
  • Chihuly Bridge of Glass
    A Gift to Tacoma The Chihuly Bridge of Glass is a 500 foot pedestrian bridge that crosses a major Tacoma, Washington interstate. The bridge links the...
  • Tier 3 Data Center
    Expansion of Data In 2012, a client had an existing data center that had reached capacity after opening only two years prior.  This data center was...
  • Hyatt Lost Pines
    Relax in the Texas Hill Country Nestled in the tall pines near Bastrop, Texas is the Hyatt Lost Pines resort.  EEA provided the hydraulic and electric...
  • Oak Creek Plaza - LEED Gold
    As a response to the growing demand for energy efficient, LEED certified office space, this two-story 45,000 square foot shell medical office building was designed...
  • California Energy Code Design (Title 24)
    New Code, New requirements California is the energy conservation leader of all states since the adoption of  energy code Title 24.  They implemented many energy conservation...
  • Seaholm Power Plant Commissioning
    Repurposing Iconic Buildings What do you do with a Power Plant built in the 1950s that stopped producing power in 1989? You turn it into an...
  • St. Edward’s University Natural Science Facility Phase 2 Commissioning
    Commitment to Sustainability and Efficiency St. Edwards University has committed to having their buildings designed, constructed, and operated with sustainability in mind.  By registering projects with...
  • Semiconductor Fabrication Facility
    National Needs EEA assisted a confidential client which operates and maintains a semiconductor manufacturing facility in the southwest United States. As the facility and tools have...
  • St. Edward’s University Satellite Chiller Plant and Distribution
    Service for Campus Growth EEA’s master planning efforts for St. Edward’s University in Austin identified the need for significant increases to chilled water system capacity.  EEA...
  • Pools of Fun
    Science Behind the Fun Swimming pools are wonderful amenities if they are clean, clear, and suitably maintained.  We design the hydraulic systems to maintain required circulation...
  • Center for Innovation in Advanced Development and Manufacturing
    Responding to a Threat In 2012, three Centers were established across the United States to provide fast, flexible access to the vaccines necessary to stop a...
  • Pickle Research Center - MER Clean Room
    Where to Build a Clean Room? Researchers at the University of Texas J.J. Pickle Research Center needed more clean room space in the Microelectronics Research building,...
  • Fort Polk Retro-Commissioning and Energy Optimization
    Making Older Buildings Better How do you fix old, existing buildings that have become less energy efficient and are providing poor thermal comfort? Retro-commissioning, which is...
  • Champion Office Complex
    Gold Office Building The Champion Office Building Complex consists of two buildings that are mirror images of one another in the hills of west Austin. Each...
  • CH47 Chinook Helicopter Maintenance Hangar
    EEA and Solis Constructors teamed up for this design-build of a new 40,000 SF helicopter aircraft maintenance building for the Corp of Engineers at Fort...
  • U.S. Border Patrol Facility
    Border Safety Borders between nations - even allied nations - are complex entities that require state-of-the-art facilities to monitor and control the flow of traffic from...
  • Fareground Food Hall
    One of most anticipated food halls comes to Austin EEA Consulting Engineers did the MEP design for one of “the seven most anticipated food halls in the...
  • Caliber Biotherapeutics
    A first of its kind, plant based vaccine manufacturing facility.
  • Nutrabolt Headquarters
    The facility used abundant natural light and an energy efficient Variable Refrigerant Volume (VRF) system as strategies to help it achieve LEED Certification.
  • Campus Transformations at UT El Paso
    An Ambitious Plan Transforming an entire University campus from a sea of asphalt into a rolling natural landscape is a monumental task. The University of Texas...