MEP Engineering

600 W. 5th

EEA provided MEP Engineering Services for the new LEED Silver, sixteen-floor (8 parking, 8 office) high rise office tower. The building consisted of four hundred parking spaces, 5,000 square feet of retail space, and 154,800 sq. ft. of leasable office space as well as serving as the future home for Horizon Bank headquarters. The design

Read More »

Union on 24th

EEA delivered comprehensive MEP services for a 30-story student housing tower near UT campus. The building features approximately 475 residential units, with a rooftop activity deck on the 6th floor, a top-level pool, grills, and landscaped areas. Amenity spaces are strategically distributed across all levels, including dedicated retail and tenant spaces on the first floor.

Read More »

Easton Park – Skyline Park

EEA provided MEP engineering services for the development of a 26-acre signature park Brookfield Residential in Austin, Texas. The park contains the following areas/features: Pavilion Building, Event Lawn, Children’s play area/playgrounds, Splash Pad, Mount Bonnell Overlook, Volleyball Courts, and Parking Lot.EEA provided additional design and construction phase services including lighting and controls for the Skyline

Read More »

St. Edward’s University Teresa Hall

EEA’s services included the targeted replacement of existing sanitary piping within 18 restrooms on the second floor of the residence hall, addressing multiple piping failures that had plagued the building for several years. The replacement of the piping necessitated the careful removal and subsequent restoration of the first-floor restroom ceilings to ensure a seamless integration

Read More »

Bureau of Indian Affairs Sherman Indian High School

EEA played a pivotal role in revitalizing the existing high school by providing the conceptual and schematic design for electrical and plumbing renovations under the BIA’s FI&R program. EEA’s approach to the electrical renovations encompassed replacing the track and field lighting and the main power distribution system within the building, ensuring enhanced efficiency and reliability.

Read More »

Spectrum Office Building

New, two-building office development. EEA provided MEP design of three stories shell building, including corridors, common restrooms on each floor, and main floor lobby area. 

Read More »

Tower Life Building

The Tower Life, historically known as the Smith-Young Tower was completed in 1928 as Mixed Use (office & retail). The scope of this thirty story building adaptive reuse project is to convert floors 2 through 30 from offices to apartments. The River Walk level was designed as retail. The mechanical scope includes specifying new chillers

Read More »

Bouldin Creek Commons Commissioning

EEA provided commissioning services for the new Bouldin Creek Commons. The building – a seven-story mixed-use development that supports 147,000 square feet of Class-A office and ground floor commercial space as well as a 510-space parking garage – was awarded LEED Gold status using the LEED v4 Core & Shell rating system. It boasts ample

Read More »

University of Texas at Austin Perry-Castañeda Library Scholars Lab

The Scholars Lab is a library-based campus-wide resource that provides researchers with infrastructure, UT Libraries subject librarian and domain-situated expertise, and opportunities for learning, consultation, collaboration and research presentation to enhance multidisciplinary research and digital scholarship. It is located on the entry-level of the Perry-Castañeda Library, It includes a Data Lab, Scan Tech Studio for

Read More »

Kissing Tree Golf Club

The Kissing Tree Golf Course is the first new, semi-private 18-hole golf course to be built in Texas in the past five years. The course serves as an extension of the natural landscape, blending grades on the edges, bringing the slopes and contours of the landscape into fairways. Each hole provides an avenue of play

Read More »