EEA played a pivotal role in revitalizing the existing high school by providing the conceptual and schematic design for electrical and plumbing renovations under the BIA’s FI&R program. EEA’s approach to the electrical renovations encompassed replacing the track and field lighting and the main power distribution system within the building, ensuring enhanced efficiency and reliability. For the plumbing renovations, EEA planned the replacement of various plumbing fixtures and distribution piping, thereby modernizing the infrastructure and enhancing the functionality of the facility.